• HDPE/PVC Pipe Exruder Mould Die Head for Pipe Extrusion
  • HDPE/PVC Pipe Exruder Mould Die Head for Pipe Extrusion
  • HDPE/PVC Pipe Exruder Mould Die Head for Pipe Extrusion
  • HDPE/PVC Pipe Exruder Mould Die Head for Pipe Extrusion
  • HDPE/PVC Pipe Exruder Mould Die Head for Pipe Extrusion
  • HDPE/PVC Pipe Exruder Mould Die Head for Pipe Extrusion

HDPE/PVC Pipe Exruder Mould Die Head for Pipe Extrusion

Product Type: PE Pipe
Screw No.: Single-screw
Automation: Automatic
Computerized: Computerized
Certification: CE, ISO9001:2008
Customized: Customized

Contact Supplier

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Condition
New
Transport Package
Wood Base
Specification
SGS CE
Trademark
YUREFON
Origin
Jiangsu China
HS Code
84778000
Production Capacity
150sets/Year

Product Description

HDPE/PVC Pipe Exruder Mould Die Head for Pipe Extrusion

Fast production speed, high output, best products: the results of the optimised interaction of extruder, corrugator and downstream equipment.

In addition to the extruder and the downstream equipment die heads are a major component in the production process.  develops its own die heads and thus achieves ideal production results.

We supply PE pipe dies and moulds, PVC pipe dies and moulds, PPR pipe dies and moulds, single wall corrugated pipe dies and moulds, double wall corrugated pipe dies and moulds, die head, all kinds of pipe die head etc.

Plastic pipe mould with die head

1. With CE Certification

2. Coule extrude different specifications

3. Long term service

Extrusion mould for PVC, PE, PPR PIPE

PVC, PE, PPR pipe mould die head


Diameter:

1.16-63mm: (PVC, PE, PPR)

2.50-110mm(PVC, PE, PPR)

3.75-160mm: (PVC, PE, PPR)

4.125-250mm: (PVC, PE)

5.200-400mm(PVC, PE)

6.315-630mm(PVC, PE)

AFTER-SALE SEVICE&TECHOLIGY SUPPORT:
1. Warranty time: One year guaranteed for quality, product whole life service any damage except the wrong operation during warranty. Period is repaired freely, But the travel and hotel expenses should be count on buyer.
2. Commissioning services: The product's installation and commissioning at the demand side, our engineers will not leave there until get your agreement.
3. Traning Services: Our engineers will train your staff in your factory or video to operate it during the period of installation and commissioning, and they will not leave there until your staff can operate it properly and normally.
4. Manintenance Services: Any malfunction happened, Once you inquiry us, We will reply you within 24 hours.
5. The File: The manual specification, report of the material which used to the equipment and other documents video related to GMP authentication information will be provided by us.


Any question, contact by 
whtsapp:+8618915692496

Send your message to this supplier

*From:
*To:
avatar Mr. Henry
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now